Product Details:
|
|
Place of Origin: | China Hebei |
---|---|
Brand Name: | HongCheng |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1Ton |
Price: | negotiable |
Packaging Details: | Standard export seaworthy package,or as required |
Delivery Time: | 7-15 work days |
Payment Terms: | 30%TT Advance + 70% Balance |
Supply Ability: | 2 Million Ton/Year |
Detail Information |
|||
Material: | Alloy | Type: | Alloy Steel Pipe |
---|---|---|---|
Grade: | P1, P2,P5,P9,P11,P91,P92 | Ends: | Beveled, Plain, Threaded, Flanged, Etc. |
Size: | Customized | Surface Treatment: | Cold Rolled |
End Protector: | Plastic Pipe Cap | ||
High Light: | P2 high pressure boiler steel pipe,customized high pressure boiler steel pipe,alloy boiler steel pipe seamless |
Product Description
High Pressure Boiler Steel Pipe is a type of alloy steel pipe characterized by its thin-walled seamless construction. It is manufactured using the hot rolled and cold drawn process, and is available in a variety of standards, such as ASTM A335 and ASTM A179. The ends of the pipes can be finished in a variety of ways, such as beveled, plain, threaded, and flanged. High Pressure Boiler Steel Pipe is designed for use in high pressure boilers by providing greater strength and higher operating temperatures. It is widely used in a variety of industries that require high quality and reliable performance. This pipe is strong and durable, making it an ideal choice for high pressure boiler applications.
Parameter | Value |
---|---|
Material | Alloy |
Application | Gas Fire Power Plant, Coal Fire Power Plant, Headers And Steam Lines, Feed Water Pipes |
Length | Customized |
Manufacturing Process | Hot Rolled, Cold Drawn, Etc. |
Type | Alloy Steel Pipe/Seamless Steel Pipe/Thin-walled Seamless Pipe |
Payment Terms | 30%TT Advance + 70% Balance |
End Protector | Plastic Pipe Cap |
grade | P1, P2,P5,P9,P11,P91,P92 |
Standard | ASTM A335,Astm A179 |
Size | Customized |
HongCheng High Pressure Boiler Steel Pipe is manufactured with precision from China Hebei. It is a seamless alloy steel pipe and alloy carbon steel seamless pipe, which is made of high grade materials, making it ideal for high pressure projects. This type of steel pipe is available in a minimum order quantity of one ton and is extremely affordable. The packaging of this product is standard export seaworthy package, or as required. It is delivered within 7 to 15 work days. The payment terms for this product are L/C, D/P, T/T, and the supply capacity is 2 million ton per year. It comes in a variety of sizes, grades, and surface treatments such as cold rolled. The sizes can also be customized according to the customer’s needs and preferences. The grades available are P1, P2, P5, P9, P11, P91, and P92.
HongCheng High Pressure Boiler Steel Pipe is extremely durable and is designed to withstand extreme pressures. It also has an end protector which is a plastic pipe cap. This ensures that the product can be used for a long time without any damage. This product is perfect for projects that require high pressure and extreme durability. It is also suitable for various industries such as automotive, oil & gas, construction, and power generation.
Packaging and Shipping of High Pressure Boiler Steel Pipe:
The high pressure boiler steel pipes are typically packed in bundles and shipped in 20ft or 40ft containers. The end of each pipe is covered with plastic end caps to protect the ends from damage during transit. The pipes are wrapped in plastic or paper to protect them from external weathering and rust. Care is taken to ensure that the bundles are securely strapped to the pallet or container to prevent any movement or damage during transit.
Q1: What is the Brand Name of High Pressure Boiler Steel Pipe?
A1: The Brand Name of High Pressure Boiler Steel Pipe is HongCheng.
Q2: Where does High Pressure Boiler Steel Pipe come from?
A2: High Pressure Boiler Steel Pipe comes from China Hebei.
Q3: What is the Minimum Order Quantity of High Pressure Boiler Steel Pipe?
A3: The Minimum Order Quantity of High Pressure Boiler Steel Pipe is 1Ton.
Q4: What is the Price of High Pressure Boiler Steel Pipe?
A4: The Price of High Pressure Boiler Steel Pipe is negotiable.
Q5: How long does it take to deliver High Pressure Boiler Steel Pipe?
A5: It takes 7-15 work days to deliver High Pressure Boiler Steel Pipe.
Enter Your Message