Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | hongcheng |
Certification: | PED、ABS、BV、DNV、GL、LR、SGS、IEI |
Model Number: | 4" TO 14" |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 0.5Ton |
Price: | Negotiation |
Packaging Details: | Plywood Cases or Pallets |
Delivery Time: | 7-15 work days |
Payment Terms: | L/C, D/P, T/T |
Supply Ability: | 100000Tons per year |
Detail Information |
|||
Place Of Origin :: | CHINA | Supply Ability :: | 10000 PC Per Month |
---|---|---|---|
Variety: | Sch5, Sch10, Sch20, Sch30, Standard, Sch40, Sch60, Xs, Sch8 | Connection:: | Soldering |
Certification :: | ISO, API, CE | Authentication: | ASME, ANSI, DIN, JIS, BS, GB, GS, KS, API |
Standard:: | Arsenic Petroleum Corporation B16.9 | Port:: | Tianjin |
High Light: | astm a234 alloy steel fittings,sch80 alloy steel fittings,180degree alloy steel tee |
Product Description
We are one of the Professional manufacturers Exporter Pipeline products in China .We can supply the best quality pipes, tubes, fittings flanges and related accessories.
According to the different varieties and requirements of pipe fittings, forging pipe fittings are mainly carried out by die forging, free forging and cutting forming processes. The general die forging method has large flash and consumes materials. In order to reduce material consumption, some pipe fittings manufacturers have begun to use flash-free forming processes, which have achieved good results. This section mainly introduces the process of die forging, free forging and machining to manufacture pipe fittings.
① Die forging
For socket-welded and threaded tee, cross, elbow and other small-sized pipe fittings, the shape is relatively complex and should be manufactured by die forging.
The blanks used for die forging should be rolled profiles such as bars, thick-walled tubes or plates. When using steel ingots as raw materials, the steel ingots should be rolled into bars in advance or used as blanks after forging to eliminate segregation, porosity and other defects in the steel ingots.
After the blank is heated, it is put into the die for forging (depending on the situation, it may be forged after initial forging), and the pressure causes the metal to flow and fill the die cavity; if the blank after die forging has flash, it must be punched The step of removing the flash and remaining material, so as to complete all the die forging work.
② Free forging
Pipe fittings with special shapes or pipe fittings that are not suitable for die forging can be manufactured by free forging process. For free forging, the general shape of the pipe fittings should be forged; such as tee, the branch pipe should be forged.
③ Cutting
For some tubular shaped pipe fittings, it can be directly cut and formed by bar or thick-walled pipe, such as double socket pipe hoop, union and so on. During processing, the fiber flow direction of the metal material should be roughly parallel to the axial direction of the pipe. For tees, crosses, elbows and pipe fittings, direct cutting of bars shall not be used.
Main Production Name | 45 / 90 / 180 Long / Short Radius Elbows, Equal / Reducing Crosses, |
Size Range | From ½” up to 106” |
Schedule | SCH STD, XS, XXS, SCH 10 ~ SCH 160 |
Main Material Code: | |
Carbon Steel | ASTM A234 WPB, WPC; ASTM A420 WPL9, WPL3, WPL6, WPHY-42 |
WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70, | |
Alloy Steel | ASTM A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 |
Nickel alloy steel | Inconel 600, Inconel 625, Inconel 718, Inconel X750, Incoloy 800, |
Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K500 | |
Stainless Steel | ASTM A403 WP304/304L, WP316/316L, WP321, WP347, WPS 31254 |
Duplex super | ASTM A 815 UNS S31803, UNS S32750, UNS S32760 |
Standard | ANSI, ISO, JIS, DIN, BS,GB, SH, HG,QOST,ETC. |
Certification: | ISO9001:2000 , API , BV , , LOIYD |
Applications | Petroleum, chemical, power, gas, metallurgy, shipbuilding.construction,water and |
Quality | High lever |
The third party | BV,,LOIYD,TUV,and other party alloyed by clients. |
Delivery Time: | At the earliest ,within the period required by customer. |
Remark: | Also can supply IBR fittings and Specialized NACE & HIC Fittings |
3.1 MTC IS OFFERED AFTER THE ORDER PLACED AND SHIPPED TOGETHER WITH THE CARGO.
Item | Description | |
Basic Information | Material Grade | Alloy 625 / N06625 , Alloy 600 / N06600 , Alloy 601 / N06601 , Alloy 718 / N07718 , Alloy C276 / N10276 , Alloy 800 / N08800 , |
Size | 1/8" to 48" ;Sch 10S to XXS | |
Standard | ASTM/ASME etc . | |
Process Method | Forged / Casting | |
Industry Advantage | Application | a) Connect pipes |
Advantage | a) High technology; good surface; high quality etc | |
Terma Condictions | Payment | T / T , LC or as negotiation |
Delivery Time | 3-10 working days after received your deposit ( Normally according to the order quantity ) | |
Package | Plywood case or as per customer’s requirement | |
Quality Requirement | Mill Test Certificate will be supplied with shipment , Third Part Inspection is acceptable | |
Quality | Test | 100% PMI test; Size test, etc |
Market | Main Market | Europe , Middle East , Southeast Asia , South America . Etc |
1 | Material: | carbon steel (ASTM A234WPS, A234WPC, A420 WPL6), |
2 | Standard: | ASME/ANSI B16.9, DIN2650,2615,2616,2617,JIS B2311, 2312,2313, EN 10253-11, EN10253-2, GB |
3 | Size: | 1/2inch~48inch |
4 | Thickness: | SCH10,SCH20,SCH30,SCH STD, SCH40, SCH60,SCH XS, SCH80, SCH100, SCH120,SCH140,SCH160,SCH XXS |
5 | Type: | Elbow, tee, reducer, nipple, plug, union, bushing, cap, etc |
6 | Surface: | Transparent oil, rust-proof black oil, hot galvanized |
7 | Weight: | Heavy light, light weight |
8 | MOQ: | 1 piece |
9 | Packaging: | 1)Wooden case |
10 | Application: | Oil, chemical industrial, water conservancy, electric power, boiler, machinery, metallurgy, etc |
FAQ:
1. Are you a factory or trading company?
We are a factory.we also have cooperated factory doing other steel business.
2. How can I get a quotation from you ?
You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.
And you can also find our contact information on contact page.
3.Can I get samples before order ?
Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings.
4. what is your delivery time ?
The time of delivery is usually around 20 days(1*20FT as usual).
We can send out in 2 days, if it has stock.
5.What is your payment terms?
Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.
6.How does your factory do regarding quality control?
Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified.
And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished,
we will make the last test to pick up the unqualified products
Enter Your Message