|
Product Details:
|
|
| Place of Origin: | China |
|---|---|
| Brand Name: | hongcheng |
| Certification: | PED、ABS、BV、DNV、GL、LR、SGS、IEI |
| Model Number: | 1/2" TO 72 " |
|
Payment & Shipping Terms:
|
|
| Minimum Order Quantity: | 1 piece |
| Packaging Details: | Plywood Cases or Pallets |
| Delivery Time: | 7-15 work days |
| Payment Terms: | L/C, D/P, T/T |
| Supply Ability: | 200,000 tons/year |
|
Detail Information |
|||
| Place Of Origin:: | China | Payment Terms: | T/T, L/C At Sight |
|---|---|---|---|
| Size: | 1/8"-2", 1/2"-48", 1/2"-6", DN15-DN1200 1/2’’~48’’(Seamless);16’’~72’’(Welded) | Standard: | ASTM A234. ASTM A420, ASTM A860 |
| MATERIAL:: | P9/P11/P12/P22/P91/92 | Application :: | Gas And Oil Pipes, Petroleum Gas, Joining Pipe Lines |
| Technics: | Forged,Casting,Welding | ||
| Highlight: | 32inch alloy steel buttweld fittings,astm a420 alloy steel buttweld fittings,1inch alloy steel forged fittings |
||
Product Description
Product Description:
1. Material:Alloy Steel Tee
2. Size range: FROM 1/2" TO 72"
3. Pressure: Sch5--Sch160,XXS
4. STANDARDS ANSI, ISO, JIS, DIN, BS, GB, SH, HG, QOST, ETC.
5. CE and certification: ISO9001:2000, API, BV, SGS, LOIYD
6. Applications range: "Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, water and nuclear power etc.”
| STANDARD |
ASME/ANSI B16.9, B16.11, B16.28, JIS B2311, B2312, B2312, B2316 ASTM A403 MSS SP-43, SP-83, SP-97 |
| MODEL | 1.Tee (Straight and Reducing) |
| 2.180 DEG Return | |
| 3.Elbow (45/90/180 DEG) | |
| 4.Cap | |
| 5. Reducer (Concentric and Eccentric) | |
| TYPE | Seam Or Seamless |
| ELBOW DEGREE | 45 degree, 90 degree, 180 degree |
| SURFACE | Black Paint, Anti Rust Oil, Hot-Dipped Galvanize |
| WALL THICKNESS | SCH5S, SCH10S, SCH10, SCH20, SCH30, SCH40, STD, XS, SCH60 |
| SCH80, SCH100, SCH120, SCH140, SCH160, XXS, 2MM | |
| SIZE | 1/2"-48"(Dn15-Dn1200) |
| CONNECTION | Welding |
| SHAPE | Equal, Reducing |
| CERTIFICATE | ISO9001 API TUV |
| APPLICATION | Petrochemical & Gas industry, Power industry, Valve industry, Water works, Shipbuilding industry, Construction etc |
![]()
![]()
![]()
![]()
![]()
FAQ
Q. How long can make delivery?
A:For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
Q:Can you provide the samples?
A:Samples can be provided with samples charge and courier fee by the buyer's side.
Q:Are the products in stock?
A:Yes.Most of our products are in stock.So we can prompt delivery.
Q:Can you accept customize?
A:Yes.It can be customized as per the customers' request.
Q:What about the quality?
A:According to the standard for production.And we can also accept the third-party
![]()
Enter Your Message