Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | hongcheng |
Certification: | PED、ABS、BV、DNV、GL、LR、SGS、IEI |
Model Number: | 1/2" TO 72 " |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 piece |
Packaging Details: | Plywood Cases or Pallets |
Delivery Time: | 7-15 work days |
Payment Terms: | L/C, D/P, T/T |
Supply Ability: | 200,000 tons/year |
Detail Information |
|||
Place Of Origin:: | China | Qualification: | API,CE,ISO9001:2008,LRQA,PED ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
---|---|---|---|
Size: | 1/2''~48''(Seamless);16''~72''(Welded) | Marking Requirements:: | As Per Your Requirements |
Wall Thickness: | Sch5~Sch160XXS | Payment Terms: | T/T, L/C At Sight |
Supply Ability: | 5000Tons/Month | Application :: | Gas And Oil Pipes, Petroleum Gas, Joining Pipe Lines |
High Light: | a234 alloy steel elbow,wp5 alloy steel elbow,90degree alloy steel fittings |
Product Description
Main Production Name |
45 / 90 / 180 Long / Short Radius Elbows, Equal / Reducing Crosses, Concentric /Eccentric Reducers, Caps, Stub Ends,Pipe fittings |
Size Range | From ½” up to 106” |
Schedule | SCH STD, XS, XXS, SCH 10 ~ SCH 160 |
Main Material Code: | |
Carbon Steel | ASTM A234 WPB, WPC; ASTM A420 WPL9, WPL3, WPL6, WPHY-42 |
WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70, | |
Alloy Steel | ASTM A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 |
Nickel alloy steel | Inconel 600, Inconel 625, Inconel 718, Inconel X750, Incoloy 800, |
Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K500 | |
Stainless Steel | ASTM A403 WP304/304L, WP316/316L, WP321, WP347, WPS 31254 |
Duplex super Duplex stainless steel |
ASTM A 815 UNS S31803, UNS S32750, UNS S32760 |
Standard | ANSI, ISO, JIS, DIN, BS,GB, SH, HG,QOST,ETC. |
Certification: | ISO9001:2000 , API , BV , , LOIYD |
Applications range: |
Petroleum, chemical, power, gas, metallurgy, shipbuilding.construction,water and nuclear power etc. |
Quality | High lever |
The third party inspection: |
BV,,LOIYD,TUV,and other party alloyed by clients. |
Delivery Time: | At the earliest ,within the period required by customer. |
Remark: | Also can supply IBR fittings and Specialized NACE & HIC Fittings |
Enter Your Message