Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | HongCheng |
Certification: | PED、ABS、BV、DNV、GL、LR、SGS、IEI |
Model Number: | 6/38” |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 0.5Ton |
Price: | Negotiable |
Packaging Details: | Standard export seaworthy package,or as required |
Delivery Time: | 5-15 work days |
Payment Terms: | L/C, D/P, T/T |
Supply Ability: | 8000MT/Month |
Detail Information |
|||
Standards: | JIS AISI ASTM GB DIN CE | Section Shape: | Round |
---|---|---|---|
Outside Diameter: | Diameter 10.3 To 1219 Mm | Packaging Details: | Ply-wooden Case /Iron Case/ Bundle With Plastic Cap |
Surface: | Black Painted,PE Coated,Galvanized. | Length: | 6 Meters, 12 Meters Or Negotiated Length |
Certificate:: | ISO 9001-2008,CE PED | Application:: | Petrochemical Power Gas, Etc |
Highlight: | WP11 Seamless Steel Pipe,ASTM A234 10 inch steel pipe,High Temperature Seamless Steel Pipe |
Product Description
A234 WP91 Customized pressure vessel, Piping of four pipelines in power plant, Factory prefabricated pipeline
In industrial construction projects, the workload of pipeline construction is large, the requirements for building quality are higher and higher, and the number of pipeline construction tasks is doubled. However, the pipeline construction procedure is complex and the number of components is huge. When the pipeline construction conditions are met, the construction period for pipeline installation is short and the task is heavy, and the phenomenon of rush for construction period often occurs. The industrialized prefabrication of pipeline is very important.
Pipeline factory prefabrication is deeply valued by the same industry because of its advantages of short construction cycle, high production efficiency and high welding qualification rate, which greatly improves the construction efficiency and construction quality.
Factory prefabrication procedure
Hebei Hongcheng Pipe Industry Co., Ltd. is a professional enterprise integrating the production, sales and export of pipe fittings and steel pipes. The company was established in 1992 and now has 418 employees, including 30 engineers, 68 management personnel, 28 foreign trade personnel, 70 special operation personnel, and 105 various technical personnel.
The company is located in Wuliyao Industrial Park, Yanshan County, with Beijing and Tianjin in the north and Huanghua Port in the east, with very convenient transportation. The company covers an area of 130,000 square meters, of which the workshop area is 60,000 square meters. Our company has more than 280 sets of modern production and testing equipment, including 20 sets of 500-10,000-ton hydraulic presses, 40 sets of various precision lathes, 6 sets of gas heating furnaces, 10 sets of heat treatment furnaces, 7 sets of pushing equipment, and more than 20 sets of testing and inspection equipment. tower.
The company has successively passed ISO9001 international quality management system certification, ISO14001 environmental management system certification, OHSA18001 occupational health and safety management system certification, and pressure pipeline component special equipment manufacturing license certification. And obtained China Datang Group Network Member Certificate, China Chemical Equipment Designated Manufacturing Enterprise Certificate, China Electric Power Parts Network Member Certificate, our company has now become Sinopec, PetroChina, CNOOC, China Coal Group, China Energy Construction, China Power Construction, Huaneng Group , Huadian Group, Shenhua Group qualified suppliers.
PRODUCT DESCRIPTION | |
Steel Type | Carbon Steel, Line Pipe Steel, Alloy Steel, Stainless Steel etc |
Factory Prefabrication Introduction (Pipe Spooling) |
The factory prefabrication of industrial pipeline refers to that plants use pipeline information software to have a centralized management of pipe sections with a single line drawing, and give full play to plant’s advantages in machinery and technological process to ensure the quality of pipeline and to improve the work efficiency. It reduces customer’s investment in manpower, site and equipment, shortens the time limit for a project, and achieves a zero inventory of piping products. |
Factory Prefabrication Advantage |
1. Highly improve the quality of piping products and increase the efficiency of construction on site 2. Greatly reduce the purchase cost and achieve the zero inventory for the purchasers 3. Furthest shorten the total construction process |
Factory Prefabrication Process |
1. Drawing Optimization Design 2. Drawing Transformation 3. Raw Materials Purchase & Inspection 4. Making the Plan for the Prefabricated Products 5. Making Prefabricated Components & Inspection 6. Assembling Prefabricated Products & Inspection 7. Packing Prefabricated Products 8. Delivering Prefabricated Products |
Material Grade |
· 20 - 20G - 12Cr1MoVG - 15CrMoG · WPB - WPL6 - WP11 - WP22 · P235GH - P265GH · WPHY60 - WPHY65 - WPHY70 · WP316L - WP321H · A105 - LF2 - F11 - F22 · F60 - F65 - F70 · F316L - F321H |
Enter Your Message