Send Message
Hebei Hongcheng Pipe Fittings Co., Ltd.

Wp12 Wp11 Steel Pipe Tee Fittings Medium High Temperature Head

Product Details:
Place of Origin: China
Brand Name: hongcheng
Certification: PED、ABS、BV、DNV、GL、LR、SGS、IEI
Model Number: 6" TO 20"
Payment & Shipping Terms:
Minimum Order Quantity: 5 pieces
Price: Negotiation
Packaging Details: Plywood Cases or Pallets
Delivery Time: 7-15 work days
Payment Terms: L/C, D/P, T/T
Supply Ability: 100000Tons per year
  • Detail Information
  • Product Description

Detail Information

Place Of Origin :: CHINA Material:: Stainless Steel
Variety: Sch5, Sch10, Sch20, Sch30, Standard, Sch40, Sch60, Xs, Sch8 Product Name:: Hemispherical Dome Hemispherical End Caps For Boilers
Certification :: ISO, API, CE Authentication: ASME, ANSI, DIN, JIS, BS, GB, GS, KS, API
Standard:: Arsenic Petroleum Corporation B16.9 Application:: Pressure Vessel
High Light:

wp12 steel pipe tee fittings

,

head steel pipe tee fittings

,

astm a234 steel pipe tee fittings

Product Description

ASTM A234 WP12 WP11 Medium & High Temperature Forged Fittings 8-18” Sch40 Head

 

ASME Stainless Steel Pipe Cap 1-48 Inch
The introduction of the stainless steel pipe fitting caps:
In the piping system,the direction of the line pipe bend is to be changed.Elbow materials:stainless steel, alloy steel, cast iron can be calcined cast iron, carbon steel, nonferrous metal and plastic, etc.
1,Stainless steel, ASTM/ASME A403 WP 304-304 - l - 304 - h - 304 ln - 304 n ASTM/ASME A403 WP 316-316 l - 316 - h - 316 ln - 316 - n - 316 ti ASTM/ASME A403 WP 321-321 - h ASTM/ASME A403 WP 347-347 - h
2,Carbon steel, ASTM/ASME A234 WPB, WPC
3,Alloy: ASTM/ASME A234 WP 11-12-1 - WP WP WP 22 - WP 91-5 - WP WP911
4,Low temperature steel, ASTM/ASME A402 WPL3 - WPL 6
5,High performance steel: ASTM/ASME A860 WPHY 42-46-52-60-65-65
6,Cast steel, alloy steel, stainless steel, copper, aluminum alloy, plastic, argon luo drain, PVC, PPR, RFPP (reinforced polypropylene), etc.
stainless steel pipe fitting plastic caps won't produce corrosion, pitting, corrosion or wear and tear.

Brand Name HONG CHENG
Product Name pipe cap,steel cap, alloy steel pipe cap
Certification SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED
Place of Origin China (Mainland)
OD 1/8-8"
Wall Thickness

SCH20,SCH30,SCH40,SCH80,SCH100.SCH120,SCH160,STD,XS,XXS,

CLASS A, CLASS B, CLASS C,

Length Less than 12m (as buyer's requirements)
Material Carbon steel(ASTM A105,A350LF2,A350LF3,)
 

Stainless steel(ASTM A182 F304, F304L,F316,F316L,F321,F347,F310F44F51,A276 S31803, A182,

F43, A276 S32750,A705 631,632,A961, A484,

 

Alloy steel(ASTM A694 F42,F46,F52,F56,F60,F65,F70, A182

F12,F11,F22,F5,F9,F91,F1ECT)

Application Petroleum Chemical,Refinery, Pharmacy Industry, Food & Beverage Industry, Sea Water Desalination,Paper Making, Shipbuilding Industry, Electric power, Offshore & onshore oil&gas, Mining Industry, Water Treatment, Mechanical Making, Chemical fertilizer etc.
Equipment Pushing machine,beveling machine,sand blasting machine,etc
Testing

Direct-reading Spectrograph,Hydrostatic testing machine,X-ray

detector,Ultrasonic flaw detector,Magnetic particle detector,etc

Connection Thread NPT, BSPT, BSP ,Socket Welding
Surface Sand blasting, Galvanized
Temperature -10°C to +150°C
Standards DIN,3A,SMS,ISO,IDF
Shape Equal

 

 

Wp12 Wp11 Steel Pipe Tee Fittings Medium High Temperature Head 0

Supply Ability 3,0000pcs per month
Price Depending on quantity
Payment Terms T/T or Western Union or LC
Supply Ability 3,0000pcs per month
Delivery Time 10-50 days depending on quantity
Packing PLY-wooden case or pallet or as for clients' requirements
Advantages

1. 20 + years of production experience at your service.

2. The fastest delivery

3. The lowest price

4. Most comprehensive standards and materials for your choice.

5. 100% export.

6. Our products EXPORT to Africa, Oceania, mid east, eastern Asia, Western Europe etc.

Special design available as the requirement of customer

Wp12 Wp11 Steel Pipe Tee Fittings Medium High Temperature Head 1

 

Wp12 Wp11 Steel Pipe Tee Fittings Medium High Temperature Head 2

 

 

 

 

 

 

 

Wp12 Wp11 Steel Pipe Tee Fittings Medium High Temperature Head 3

 

 

Wp12 Wp11 Steel Pipe Tee Fittings Medium High Temperature Head 4

FAQ:

 

  1. Are you a factory or trading company?

  We are a factory.we also have cooperated factory doing other steel business.

  2. How can I get a quotation from you ?

  You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.

  And you can also find our contact information on contact page.

  3.Can I get samples before order ?

  Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings.

  4. what is your delivery time ?

  The time of delivery is usually around 20 days(1*20FT as usual).

  We can send out in 2 days, if it has stock.

  5.What is your payment terms?

  Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.

  6.How does your factory do regarding quality control?

  Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified.

  And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished,

  we will make the last test to pick up the unqualified products

Get in touch with us

Enter Your Message

You Might Be Into These